Medical equipment delivery and handover: a document checklist
Prepare the handover record before delivery: identify the ordered configuration, required documents, accessories, receiving checks and responsible people. Delivery, installation, acceptance and clinical authorization are separate decisions. Acceptance methods must follow the applicable model instructions and the responsible facility’s procedures.
| Stage | Record to prepare | Question before sign-off |
|---|---|---|
| Before dispatch | Approved order scope and packing list | Do model, variant, quantities and accessory codes match? |
| Receiving | Delivery record, labels and condition observations | Are any items missing, damaged or different from the order? |
| Document handover | Instructions, declarations and applicable supporting records | Are documents for the actual model and language supplied? |
| Technical acceptance | Facility-approved criteria, test record and authorized reviewer | Are methods and limits taken from applicable instructions? |
| Service handover | Written warranty, training and contact responsibilities | Who owns each unresolved item after delivery? |
Freeze the approved configuration
Identify the quotation and order revisions that define the accepted package. List base units, accessories, consumables, installed options and software where applicable. A packing list confirms what a shipment declares; it does not by itself confirm performance, regulatory status or conformity of every configuration. Ask the supplier to resolve discrepancies before treating the configuration as accepted.
Record identity and document gaps
Record model and serial or other identifiers from the delivered labels using the facility’s normal process. Check the supplied instructions against that identity. Retain the original documents and their revision details. If a document names a different model, do not overwrite the record with a similar-looking product’s details; request an explanation and the correct version.
Agree who performs acceptance
The receiving facility should identify the qualified people, approved procedures, applicable limits and required test equipment. This checklist does not provide device operating settings or a substitute test protocol. For pumps, ventilators and monitoring systems, use the exact manufacturer instructions and facility requirements; generic website specifications cannot establish safe acceptance limits.
Document outstanding issues and responsibilities
Assign an owner, requested evidence and resolution condition to each open item. Record the agreed training scope, warranty conditions and service route in writing. The certificate copies in this site’s document centre identify COMEN as holder; they do not establish that WANLIN is the authorized local service provider or that an installation has been accepted.
Does receiving a certificate mean delivery can be accepted?
No. Check model identity, ordered scope and the facility’s acceptance requirements separately. A certificate copy is one evidence item.
Are installation and clinical release the same as delivery?
Treat them as separate recorded decisions under the receiving facility’s procedures and the written agreement.