Compare medical equipment quotations by configuration and evidence
Compare quotations on a common configuration, document set and delivery scope before comparing totals. Record each difference explicitly: base unit, accessories, options, consumables, training, service and exclusions. An unknown field should remain unresolved rather than being treated as included or scored as compliant.
| Comparison item | Evidence to request | Record the difference |
|---|---|---|
| Base unit | Exact model, variant and software identity | Model-name or version mismatch |
| Included items | Itemized accessory and consumable codes with quantities | Included, optional, excluded or unconfirmed |
| Documents | Instructions, declaration and applicable certificate schedule | Exact model match and missing evidence |
| Delivery and payment | Written currency, validity, place and agreed conditions | Different commercial bases or unspecified charges |
| Handover | Acceptance, training, warranty and service responsibilities | Named owner and written deliverable |
Create one comparison sheet for every offer
Use rows that match the RFQ requirement identifiers and separate columns for each supplier. Preserve the original quotation number and revision date. Copy statements faithfully and link the supporting page; do not silently convert an optional feature into a supplied component. Compare totals only after the same required scope has been identified.
Resolve differences at the model and accessory level
A similar screen size or parameter count does not establish equivalent intended use, patient groups or sensor compatibility. For N10M/N12M/N15M, record the exact member of the MN family and the proposed configuration. For NC5, request the precise use, patient-group and accessory instructions rather than inferring neonatal suitability from the department buying it.
Separate the purchase price from unpriced dependencies
List the consumables, reusable accessories, installation prerequisites and service items needed by the proposed configuration. Request quantities and a costing period before estimating operating expenditure. No published price, stock position, maintenance interval or consumption rate is established by this catalogue; use supplier evidence and the purchaser’s own assumptions.
Close the comparison with a clarification log
Record what was asked, who must answer, the source received and whether the requirement is resolved. Keep technical and commercial approval separate so that an attractive price does not substitute for missing model evidence. Retain every revised offer and obtain written confirmation of the final included scope before an order is accepted.
Can the cheapest quotation be selected immediately?
That is a purchasing decision. First establish whether the offers cover the same required configuration and responsibilities; this page does not rank suppliers or recommend a purchase.
How should a missing specification be handled?
Mark it unconfirmed, request the exact model-specific source, and record who must resolve it. Do not fill the cell from a different model’s brochure.